Saturday, June 7, 2008

How the guest house coming?

IMG_2673 Good question.  And here is a short answer with some pics to go along.  Bob Wright is back to head up the teams who will work on completing some important tasks over the next month.  A wall is to be built around the property, plastering will be done inside and possibly out.  The water system will also be hooked up.  Bob will be joined for the month by Chris, Keith and Mike.  Thanks for coming guys!

Do pray for safety on the job site.  Pray that everyone would be free from sickness.  Also pray for good rest, as it is noisy and life begins very early in Ansagale (like 4AM).

IMG_2677

The guys display their new Haitian hats on the ferry

IMG_2755

Keith blocks up the conference room holes

IMG_2759

Mike washes up after a long day.  We do have camp showers :)

IMG_2758

Bob fixes up our brand new "Super" wheelbarrows that really need help

IMG_2695

Foundation for the wall goes in

IMG_2772

Laying rocks and mortar

IMG_2780

One wall plastered in on of the guest bedrooms

IMG_2787

These guys are willing to work rain or shine.  Bob even came prepared with his raincoat.

No comments:

Post a Comment